ADVANTIS software
for a systematic approach to Safety
of Amusement Rides and Devices

For Ride Manufacturers
EN13814 and ISO17842 require Designers and Manufacturers to include a Design Risk Assessment (DRA) in the technical dossier.

For Park Operators
EN13814 and ISO17842 require Owners and Operators to conduct an Operation and Use Risk Assessment (OURA) for every new installation.

New ASTM Standard
ASTM F3598, is the new international standard for Amusement Ride Safety
ADVANTIS creates 100% compliant Risk Assessment Reports for you in just a few simple steps.

ADVANTIS is an excellent tool as we navigate the risk assessment process on a project with multiple vendors. It allows us to clearly document the hazardous events considered and how all parties contribute to mitigating those events. It has also brought forth important discussion points about vendor’s design intentions earlier in the project timeline than our previous approach.
Eric Wilcox PE | CWI - Rides Engineer – Silver Dollar City
As a first-time ride designer / developer, there is a steep learning curve for all that is involved. Thankfully, Advantis has streamlined the risk assessment (DRA) process and made it completely user-friendly and unintimidating. The software is intuitive, and the output report is comprehensive and impressive. Philipp, Stephan and the whole team are incredibly knowledgeable and offer top notch support. Advantis should be an industry standard. Highly recommended!
Hannah de Bie | VP of Marketing & Communications Sub Sea Systems
I have really enjoyed working with the software, I think this is a great tool and I am excited to incorporate this into the Setpoint standards for our SLRA.
Trent Bitton | Principal Engineer
It took me a bit to get my head around the flow of information at the ADVANTIS software, since the software was different to our internal excel spreadsheet. But I have to say, I now love the user experience the tool provides.
Roland Eijkelenbergh | Division Manager Engineering

Amusement Ride Risk Assessment Software

ADVANTIS helps you create amusement ride risk assessment reports without the need of timely edits.

You can add your project information into the database through a few easy steps; from an initial hazard identification, to risk estimation using your own risk matrix to a listing of risk reduction measures following an ISO compliant process.

Ride Designer/Manufacturer

As a ride designer/manufacturer, you are required by industry standards to conduct a Design Risk Assessment (DRA).
ADVANTIS can assist you in a structured and formal process to create a Risk Assessment Report
which is in full compliance with ISO12100 and ISO13849-1/IEC62061.

The Inspection Body will ask you for your Risk Assessment Report before allowing your new ride to go into operation.

Park Owner/Operator

With the new release of industry standards (EN13814 and ISO17842) every existing and new
installed amusement ride is required to have an Operation and Use Risk Assessment (OURA) conducted.
ADVANTIS provides a structured and formal process to comply with these new requirements.

Have your Risk Assessment Report ready when the State Inspector is asking for it during his periodical inspection.

Discover ADVANTIS

Amusement Ride Risk Assessment Software

High Efficiency

ADVANTIS is a web-based risk assessment software, which means you can create risk assessment and collaborate wherever you are.

Fully Customizable

All your risk assessment data will be in the database, enabling you to quickly and efficiently edit, organize, and customize your risk assessment report.

Industry Standard Compliance

ADVANTIS takes the burden of manual organizing risk assessment data, providing a smarter workflow enabling you to reliably create, edit, and generate risk assessment reports which is in full compliance with industry standard.

Secure

Our server infrastructure is located in Switzerland maintained at highest security and availability standards in order to guarantee secure data storage and uninterrupted accessibility.